| # | Item | Description | Unit | Quantity |
|---|---|---|---|---|
| 1 | Piping Spool | L-STATION DESAL REQUIRED FABRICATION, SUPPLY AND INSTALLATION OFTEMPORARY PIPE SPOOLS AND FITTING FOR DIVERTING DISCHARGE OFNEUTRALI ZATION PUMPS TO L1 WASTEWATER MONITORING BASIN.SIZE: DN300,MATERIAL : PVC OR GRPLENGTH: 30 MWORK SCOPE :1)#SITE SURVEY TO ASSESS TH E VOLUME OF WORK2)#SUPPLY AND FABRICATION OF TEMPORARY PIP SPOOL AS PER SITE DIMENSION3)#REMOVAL OF EXISTING PIPE SPOOL TO MONITORIN G BASIN4)#INSTALLATION OF TEMPORARY PIPE SPOOL5)#REMOVAL OF TEMPORARY PIPE SPOOL AFTER CLEANING OF MONITORING BASIN6)#REINSTATE OF P ERMANENT PIPE SPOOL TO MONITORING BASIN7 | Set | View |
| 2 | Piping Spool | L-STATION DESAL REQUIRED FABRICATION, SUPPLY AND INSTALLATION OFTEMPORARY PIPE SPOOLS AND FITTING FOR DIVERTING DISCHARGE OF OILY PI TPUMPS TO L1 WASTEWATER MONITORING BASINSIZE: DN 80,MATERIAL : PVC OR GRPLENGTH: 30 MWORK SCOPE :1)#SITE SURVEY TO ASSESS THE VOLUM E OF WORK2)#SUPPLY AND FABRICATION OF TEMPORARY PIP SPOOL AS PER SITE DIMENSION3)#REMOVAL OF EXISTING PIPE SPOOL TO MONITORING BASIN 4)#INSTALLATION OF TEMPORARY PIPE SPOOL5)#REMOVAL OF TEMPORARY PIPE SPOOL AFTER CLEANING OF MONITORING BASIN6)#REINSTATE OF PERMANEN T PIPE SPOOL TO MONITORING BASIN7)#ALL CONSUMABLES LIKE BOLTS | Set | View |